Installation and Precaution on Squatting pan

2023-03-31

Installation on Squatting pan

First,before the installation of the squat toilet,it is necessary to check whether there is sundries in the pipeline,avoiding the blockage after installation.

Second,make sure the location of the squatting pan installation,such as height and the connection of drain hole.

Third,The installation of the inlet and the water tank,the distance from the bottom of the tank to the inlet is about 1500mm-1800mm.The water pressure and water to keep within the scope of the standard.

Forth,the suction pipe of the squat toilet should be fixed with a rubber ring,which is connected with the water inlet of the squat toilet.Finally,seal the interface between the drain and the drain pipe of squatting pan.


Precaution on squatting pan

First,when using,do not throw other easily clogging items,like newspapers,diapers and so on into squatting toilet.

Second,avoid using hard objects directly to the surface of the toilet,so as not to damage the surface of the squat toilet.

Third,to ensure the cleanliness and hygiene of the urinals,and to prevent the growth of bacteria,using cleaning fluid and disinfectant to sterilize the squat toilet regularly and keep its surface clean and tidy.

Forth,when you're using the flush,don't use too much force to push the button.

stainless steel squatting pan


Get the latest price? We will reply as soon as possible (within 12 hours)